Nigerian community at dusk lit by electric light
← All mini-grids
Permitting

Ogun State demonstrator

A peri-urban estate two hours from Lagos chosen for payment density and regulatory simplicity.

Location

Ogun State

Hover or tap a marker for details

NIGERIAN

Legend

  • This site — the page you're viewing.
  • Other Common Watt sites — tap a marker for a quick view.

Quick view shows: capacity in kW (panel + battery rating), connections (homes & businesses metered), go-live (date energised or planned), and status (Permitting, Construction, or Live).

Capacity
250 kW
Connections
190
Go-live
Q3 2026
Status
Permitting

Key metrics

Site at a glance.

250 kW
Capacity
190
Connections
Ogun State
State
Q3 2026
Go-live
Permitting
Status
TBC
Lead partner

Why this site.

A peri-urban residential estate in Ogun State, ~190 households and 12 small commercial loads, two hours from Lagos. Payment density is high and the state's SERC was the first to stand up under the Electricity Act 2023.

The community is currently served by an unreliable national feeder (4–7 hours of power per day) supplemented by household petrol generators. A solar mini-grid replacing both will halve the per-kWh cost and remove generator fumes from the estate.

The build.

  • · 300 kWp solar PV array on a 0.4-hectare leased site
  • · 750 kWh lithium iron phosphate battery (BYD or comparable)
  • · Three-phase Victron / SMA inverter stack, redundant
  • · Smart prepaid meters at every connection (Steamaco / SparkMeter)
  • · 3.2 km of low-voltage distribution to households and commercial loads

Tariff structure.

Residential₦2,500–₦8,000 / month
Commercial₦22,000–₦60,000 / month
Productive use₦85,000+ / month

Partners.

EPC: TBC
Financier: Common Watt SPV
Regulator: SERC Ogun

Project timeline.

  1. 2026-04-12
    Permit application filed with Ogun SERC.
  2. 2026-03-28
    Land lease executed with community trust.
  3. 2026-02-10
    Load survey completed across 187 of 190 target households.
  4. Q3 2026
    Site go-live (planned)

Updates.

  • 2026-04-12Permit application filed with Ogun SERC.
  • 2026-03-28Land lease executed with community trust.
  • 2026-02-10Load survey completed across 187 of 190 target households.